Built, not just bought.
Every one of these started with a walk on raw ground. Drone shots, site plans, and the stormwater work most people never see.
Fly it. Walk it. Before a shovel hits the ground.
For a boat & RV storage development in Winston-Salem, NC, we commissioned a full 3D rendering of the finished site set inside real drone photography of the surrounding market — the kind of investment most developers skip. Spin the view from the air, click through at street level, and open the market panel to see how the site sits relative to the airport, Wake Forest, and Charlotte.
Originally planned as a Stanley Storage location; the project was sold to another operator. Experience produced by Oval Room Group.
From cleared ground to a finished pad.
One site, three seasons. Drag the handle to compare the day clearing finished with the graded, stabilized pad.

ClearedGraded



Where we've put our name.
Pilgrim Ridge Townes
Gravely Road · Greer, SCA 47-lot townhome community on about 10 acres inside the City of Greer, developed in partnership with BEI Development — taken from raw ground through civil design, entitlement, and a new public road to builder-ready lots.
- 47 townhome lots
- ~9.95 acres
- In partnership with BEI Development
- New public road
Stanley Storage
Seneca · Anderson · Pelzer, SCThree RV, boat, and mini-storage facilities built from the ground up — clearing, grading, stormwater, gated and camera-monitored — then expanded in 2024 with container mini-storage at Seneca and Anderson.
- Ground-up development
- 2024 container expansion
- Stormwater & retention
- Operating today
Old Canaan Road Lots
Spartanburg County, SCA three-acre tract surveyed and split into four residential lots plus a remainder — the kind of quiet land work that turns one parcel into several homesites.
- 4 lots of 0.55–0.76 ac
- Surveyed & platted 2025
- Residential
SC Highway 135 Split
Pickens County, SCA one-acre tract carved from a 3.65-acre parcel on Highway 135 — giving the owner a sellable homesite while keeping the balance of the land.
- 3.65 ac → 1.00 ac tract + 2.76 ac remainder
- Platted Feb 2026
- Land split
Plan backdrops are our own civil drawings and surveys, softened for privacy.
The part of development nobody photographs.
Every pad we build sheds water somewhere, and how you handle that decides whether a site stays clean and legal. We use Rymar Waterworks Marlee Float skimmers in our retention ponds — a Greenville-made floating skimmer that draws the cleanest water off the top so sediment stays on site and out of the creek. In our view, the best skimmer on the market, and we don't cut corners on it.

Rymar Marlee Float skimmer · Seneca retention pond
Managed in person. Every site, every meeting.
Selling, buying, or exploring a partnership?
It starts with a phone call. No obligation, no pressure — and if we're not the right buyer for your property, we'll tell you who is.
Or call Brayden directly: 864-372-1402 · Greenville, SC